Solutions · 02 Wireless
BIM-grade models. Mod packages signed off the first time.
BIM2BIM change detection compares as-designed to as-built at the component level, so engineering catches conflicts before crews return to the tower.
§01What you get
01
As-built to BIM in one pass
Field capture flows directly into an engineering-grade model — no CAD hand-off tax.
02
BIM2BIM change detection
Diff as-designed vs. as-built at the component level. Conflicts caught pre-construction.
03
Mount analysis ready
Loading data exported to structural in the format your PE already uses.
04
One package, one review
RFIs down, first-pass approvals up. Fewer truck rolls, faster billing.
§02Outcomes we track
94%
First-pass sign-off
Placeholder
-71%
RFI reduction
-48%
Cycle time
98%
QC pass rate
Placeholder figures — pending verified metrics.