Solutions · 03 Fiber

One system of record — pole job to CD pack.

Every strand, splice, and slack loop tracked across all eleven Flight OS modules. As-builts leave the field in the format the utility wants.

§01What you get
01

Pole-to-CD continuity

The same record travels from pole survey through construction to the closeout deliverable.

02

Eleven modules, one graph

Design, permit, construction, splice, test, and as-built stay linked — not exported and re-imported.

03

Utility-ready deliverables

CD packs shaped to the utility's spec, generated from the field data — no separate drafting pass.

04

Closeout in days, not months

Because the as-built was captured during the build, not reconstructed afterward.

§02Outcomes we track
3,200+
Miles built
Placeholder
5 days
Closeout turnaround
99.6%
Splice accuracy
11 / 11
Modules

Placeholder figures — pending verified metrics.

Ready to see it running on your fiber workflow?

Unlock walkthrough →